Word in today that a major maintenance project at the Port of Everett we told you about in January is now complete. Here’s the update from the Port.
Maintenance dredging at the Jetty Landing Boat Launch is now COMPLETE, just in time for another great boating season ahead! Port contractor American Construction Company removed a total of 33,000 cubic yards of river sediment – equivalent to about 3,000 dump truck loads. As part of this project, the Port also sought emergency authorization to dredge a connector channel through a sandbar that has formed just beyond the launch entrance to ensure facility access at all tide levels. Boaters are still encouraged to ingress and egress the launch via a straight shot through the connector channel to the deeper portion of the river channel during low tide.
February 23, 2022
Everett