Street resurfacing will take place on the following streets this summer. Here’s a link to a map of the various locations.
EVERGREEN WAY E CASINO RD TO HOLLY DR **May include nighttime work**
BROADWAY 15TH ST TO 18TH ST **May include nighttime work**
W/E CASINO RD 5TH AVE W TO EVERGREEN WAY **May include nighttime work**
PECKS DR EVERGREEN WAY TO BEVERLY LN **May include nighttime work**
WETMORE AVE ALVERSON BLVD TO 10TH 5 STREET SEG
WETMORE AVE ALVERSON BLVD TO 10TH 6 INTERSECTIONS
COLBY AVE ALVERSON BLVD TO 10TH ST
9TH ST WETMORE AVE TO COLBY AVE
8th ST WETMORE AVE TO COLBY AVE
7th ST WETMORE AVE TO COLBY AVE
6th ST WETMORE AVE TO COLBY AVE
5th ST ROCKEFELLER AVE TO COLBY AVE
ALVERSON BLVD MAULSBY LN TO ROCKEFELLER AVE
ROCKEFELLER 5TH TO ALVERSON
52ND ST SE BROADWAY TO SOUTH 2ND AVE **May include nighttime work**
33RD AVE W 54TH ST SW TO 52ND PL SW
52ND ST SE OCEAN AVE TO 33RD AVE W
2901 COLBY AVE ALLEY ALLEY
2801 COLBY AVE ALLEY ALLEY
3702 COLBY AVE ALLEY ALLEY
3701 COLBY AVE ALLEY ALLEY
3601 COLBY AVE ALLEY ALLEY
COLBY AVE 37TH TO 40TH
July 7, 2021
Everett