The bright green cranes were docked in a temporary spot and their orange bracing will be taken away.
Later they will be moved upland for final adjustments and by the end of the year should be in place at the south end of the waterfront.
The bright green cranes were docked in a temporary spot and their orange bracing will be taken away.
Later they will be moved upland for final adjustments and by the end of the year should be in place at the south end of the waterfront.
June 11, 2019
Everett Economy